Atp processing error scheduling failed relationship

ATP Error Scheduling failed

ATP processes for new Sales orders or canceled Sales Orders will also update the How Can We Avoid The Error: Scheduling Failed. .. Also shows the difference between Order Date Type Schedule and Arrival (the type of. ONT - ATP Error Scheduling failed When scheduling the line got error ATP Error Scheduling failed. How will you resolve. 2 Answers are. I received the note in a pop up box that said Scheduling Failed, ATP Processing Error I was not able to change the configuration now? Can you.

When the plan run is in process on Plan B and you enter new orders, Oracle Global Order Promising provides you with schedule dates that can be promised against Plan A. At the end of the plan run, the synchronization process takes place. In this process, orders scheduled against Plan A during the plan run on Plan B are checked against the new plan data in Plan B. If it is not possible to meet the original schedule date in Plan A, an exception is raised.

The original schedule date of the sales order will not change. You can view the following results in the Planner Workbench: Orders that are synchronized. The orders are synchronized until no more are available to synchronize or to a point specified in the MSC: ATP 24x7 Synchronization Downtime profile option. At this point, ATP shuts down temporarily. Any remaining sales orders are synchronized, and Plan B becomes Plan A. All new sales orders from this point forward are promised against the new ATP plan.

Technical Notes Some scheduling transactions, such as orders with many lines, may run longer than the downtime. The synchronization process will continue to run for an extended period of time even after the new plan is in place to ensure that these transactions are processed. The extended time is the maximum of 10 minutes or the time set in the MSC: If you terminate the synchronization concurrent request, make sure that the underlying process is terminated at the database level before you initiate another synchronization process.

Consult your DBA to check whether the database processes are complete. A plan run can fail during: The refresh snapshot process ATP post-plan processing Continual ATP synchronization The effect of a failure and the action that you need to take are discussed in the following sections. Failure during the refresh snapshot process When the refresh snapshot process for the continual plan run fails, the original plan is available for ATP inquiry.

However, the refreshed plan is not available. Re-launch the plan to complete the plan run process. If the value is No Reservations then you can perform all scheduling functions except for reserving inventory. On-hand inventory is available to fulfill the order. Autoschedule is on, and the reservation time fence is 5 days. The user enters an order line with the item, quantity and request date. When the line is saved, because autoschedule is on, it is automatically scheduled for the requested warehouse with a schedule ship date of today and a schedule arrival date of today plus 5 days.

ATP Based on Planning Output: Part II

Because the schedule ship date is within the reservation time fence the line is also automatically reserved. No warehouse is defaulted or entered for the order. No shipping network is defined for the customer. There is no inventory available to fulfill the order, but there is a work order scheduled for completion in 10 days, and your ATP rule includes work orders as a source of supply. Autoschedule is off, but the line level workflow process has the scheduling activity immediately after booking as a synchronous activity.

The user enters an order line with the item, quantity and request date and saves the line. Because autoschedule is off, no scheduling action occurs at this time. The user enters additional lines and then books the order. As soon as the order is booked, the scheduling activity from the workflow executes.

The warehouse is determined by the sourcing rules. The schedule arrival date is the same as the schedule ship date, because the shipping network is not defined for this combination of customer, warehouse and ship method. The warehouse is defaulted from the customer ship to site. There is no inventory available to fulfill the order, and there are no work orders or purchase orders for the items.

Your ATP rule specifies an infinite supply time frame of 30 days. The customer has a Latest Schedule Limit of 10 days. So the scheduling activity fails, the user sees an error message, and the line remains at the workflow activity of Schedule - Eligible until a source of supply can be created or until the Latest Acceptable Date is changed.

Then the line can be scheduled by either manually progressing the line or running the scheduling concurrent program. Schedule Lines on Hold - Possible values are yes and no.

If this field is yes, the scheduling action processes order lines even if the order or line is on hold. If no the scheduling action will fail. Autoschedule - Possible values are yes and no. If this field is yes the availability window is displayed when the sales order form is opened and scheduling occurs automatically as each order line is saved.

Reservation Time Fence - This may be any positive integer numeric value. When a line is scheduled it is also automatically reserved whenever the schedule date is within the reservation time fence. Auto Push Group Date - Possible values are yes and no. If the value is yes and a line is added to a scheduled configuration, and the new line cannot be scheduled on the date that the rest of the configuration is scheduled, then the system will try to reschedule the complete configuration at a different time.

If the value is no and the new line cannot be scheduled, then scheduling for the new line will fail and the rest of the configuration will not be affected. It specifies the assignment set that will be used for calculating ATP.

Assignment sets are mentioned later in this section. This profile option indicates whether and how to enable the CTP calculation. Reserved inventory cannot be used for any other purpose. The reserved quantity for a sales order line is displayed on the shipping tab. You may reserve part or all of the ordered quantity. A line must be scheduled before it can be reserved.

If you try to reserve an unscheduled line, the system will first try to schedule the line.

Oracle Applications: Oracle Order Management Metalink Note Ids

If the line is successfully scheduled then the system will try to reserve it. There are two ways to reserve from the sales order form. Business Application Basic ATP allows you to receive detailed information about whether your availability check request can be met and on what date the request can be fulfilled. Based on statements of current and planned material supply, Basic ATP determines the availability of items.

You perform a Basic ATP check when you have only one ship-from location in your company or when you want to check availability in one inventory location. When you initiate ATP from another application, such as Oracle Order Management, you must specify a shipping organization. The calling application may have its own way to supply a default shipping organization.

Refer to the calling application's user guide for further details on shipping organization specifications. If supply is available, then you are done. Otherwise, go to Step 2. ATP fails to satisfy this request. From the sysdate, ATP performs forward scheduling for this request.

This value is the ATP date.

Skills for Healthy Romantic Relationships - Joanne Davila - TEDxSBU

Otherwise, it returns a failure. The Latest Acceptable Date is a date beyond the request date that the customer will accept the order.

This date is determined by any calling application, and it is passed to Oracle Global Order Promising. However, the calling application may decide to show only a subset of the information. You rank the supply organizations so that ATP checks for availability in the order you want.

Oracle Global Order Promising also drills down to look at availability at every supply organization. Alternatively, you can check ATP for all possible supply locations, drill down to ATP details, and select the desired location. Any environment where multiple supply locations are used to fulfill order demand can benefit from this feature. As you utilize available inventory from other locations, you can successfully meet customers requirement and thus increase your company's overall order fill rate by utilizing inventories that might otherwise be excess.